Coldcrete has successfully implemented and completed concrete cooling and heating projects around the world. Here are some of our featured projects.

Red Rock Hydroelectric Project

Pella, Iowa, USA 2016

  • Developer: Ames Construction
  • Project Type: Flake Ice Concrete Cooling
  • Project Specs: 750 yards³ day and 70°F placement specification

Ames Construction is retrofitting the existing U.S. Army Corps of Engineers Red Rock Dam on the Des Moines Riveran existing dam for hydroelectric power. The Red Rock Hydroelectic Project is licensed by the Federal Energy Regulatory Commission and will have a rated generating capacity of 36.4 MW at normal reservoir level. The combined maximum generating capacity will be 55 MW at higher reservoir levels and/or flows. The estimated annual energy produced by the project will be 178,000 Wh, or enough to power approximately 18,000 homes.

Keeyask Generating Station

Pella, Iowa, USA 2016

  • Developer: BBE Hydro Constructors, LP
  • Project Type: Custom Concrete Cooling & Heating System
  • Project Specs: 300 meters3 per hour and 10°C placement specification

A $1.4 billion general civil contract has been awarded to a limited partnership between Bechtel Canada Co., Barnard Construction of Canada Ltd. and EllisDon Civil Ltd. for construction of the proposed 695-megawatt Keeyask generating station. Manitoba is growing and so is the demand for electricity. New sources of electricity are needed to maintain the reliable supply Manitoba Hydro customers count on. The Keeyask Generating Station will fill this need. When completed in 2021, it will add approximately 4,400 gigawatt-hours of renewable electricity per year to Manitoba Hydro’s total supply. That’s enough electricity to power 400,000 homes.

Folsom Dam Auxiliary Spillway, Phase 4

Folsom, California, USA 2013-2014

  • Developer: BBE Hydro Constructors, LP
  • Project Type: Custom Concrete Cooling & Heating System
  • Project Specs: 150 yards3 per hour and 55°F placement specification

The award marks the beginning of the fourth and final construction phase of the spillway project, an approximately $900-million cooperative effort between the U.S. Bureau of Reclamation, Central Valley Flood Protection Board, Sacramento Area Flood Control Agency and the Corps to help reduce the Sacramento region’s flood risk. The spillway will allow the Bureau of Reclamation to make more controlled water releases from Folsom Dam earlier during large storms. The Bureau of Reclamation completed most of the excavation for the spillway chute in the project’s first two phases. In May 2012, Granite Construction Company of Watsonville began construction on the project’s third phase: the spillway’s control structure, essentially a second dam. In phase four, the Corps will oversee Kiewit’s construction of a 3,027-feet-long spillway chute and stilling basin, as well as the 1,100-feet-long approach channel that connects the new spillway to the reservoir.

Willow Island Hydroelectric Project

St. Marys, West Virginia, USA 2012-2013

  • Developer: The Ruhlin Company
  • Project Type: Custom Concrete Cooling System
  • Project Specs: 200 yards3 per hour and 55°F placement specification

The Willow Island project will divert water from the existing Corps Willow Island Locks and Dam through bulb turbines to generate an average annual output of approximately 239 million kilowatt-hours (kWh). The site will include an intake approach channel, a reinforced concrete powerhouse and a tailrace channel. The powerhouse will house two horizontal FERC rated 17.5 MW bulb type turbine and generating units with an estimated total FERC rated capacity of 35 MW at a gross head of 20 feet. A 1.6-mile-long 138 kV transmission line interconnection is planned to connect to PJM. The Willow Island Locks and Dam are located in Pleasant County, West Virginia, approximately 162 river miles downstream of Point Bridge, Pittsburgh. The Willow Island project is under construction on the West Virginia side of the Ohio River, on the opposite shore of the locks.

La Vegona Hydroelectric Project

Cortes y Yoro, Honduras 2011-2012

  • Developer: Compania Hondurena de Energia Renovable S.A. de C.V. (COHERSA)
  • Project Type: Custom Concrete Cooling System
  • Project Specs: 80 meters3 per hour and 13°C placement specification

The La Vegona hydropower project comprises a 38.5 MW run-of-the-river hydroelectric development on the Humuya or Comayagua River, 8 kilometers downstream from the existing 300MW Francisco Morazan (“El Cajon”) hydroelectric project. The Project is expected to produce an average of approximately 172 GWh per annum. The Project will sell electricity to industrial clients as well as the state-owned utility ENEE under long-term power purchase agreements (“PPA”).

Folsom Dam Auxiliary Spillway, Phase 3

Northern Manitoba, Canada 2015-2017

  • Developer: Granite Construction Incorporated
  • Project Type: Custom Concrete Cooling & Post-Cooling System
  • Project Specs: 125 yards3 per hour and 55°F placement specification

The auxiliary spillway is being built to address the hydrologic risk to Folsom Dam identified by BuRec’s Safety of Dams program. The work is a Joint Federal Project by BuRec, the Corps, California Department of Water Resources, and Sacramento Area Flood Control Agency. The control structure includes foundation excavation and preparation, submerged tainter gate fabrication and installation and mass concrete placement. The structure includes two 89-foot-wide independent flow-through monoliths flanked by three non-flow-through monoliths. Each flow-through monolith is to house three submerged tainter gates, 23 feet wide by 34 feet tall.

Full Projects list

CHICKAMAUGA LOCK REPLACEMENT PROJECT

(USA)

AECOM ENERGY AND CONSTRUCTION INC, SYSTEM PROVIDER 2018

RED ROCK HYDROELECTRIC PROJECT

(USA)

AMES CONSTRUCTION INC, SYSTEM PROVIDER 2016

KEEYASK GENERATING STATION

(CANADA)

BBE HYDRO CONSTRUCTORS LP, SYSTEM PROVIDER 2015-17

FOLSOM DAM SPILLWAY, PHASE 4

(USA)

KIEWIT INFRASTRUCTURE WEST CO, SYSTEM PROVIDER 2013-14

ATLANTIC BRIDGE PROJECT

(PANAMA)

VINCI CONSTRUCTION GRANDS PROJETS, SYSTEM PROVIDER 2013-14 

WILLOW ISLAND HYDROELECTRIC PROJECT

(USA)

THE RUHLIN COMPANY, SYSTEM PROVIDER 2012-14 

LA VEGONA HYDROELECTRIC PROJECT

(HONDURAS)

COHERSA, SYSTEM PROVIDER 2011-12

BLUESTONE DAM

(USA)

BRAYMAN CONSTRUCTION CORP, SYSTEM PROVIDER 2011-12

FOLSOM DAM SPILLWAY, PHASE 3

(USA)

GRANITE CONSTRUCTION CO, SYSTEM PROVIDER 2011-12

CANNELTON HYDROELECTRIC PROJECT

(USA)

WALSH CONSTRUCTION CO, SYSTEM PROVIDER 2010-11

SAN VICENTE DAM RAISE

(USA)

SHIMMICK CONSTRUCTION CO/OBAYASHI CORPORATION JV, SYSTEM PROVIDER 2010-11

KENTUCKY LOCK ADDITION

(USA)

THALLE CONSTRUCTION CO, SYSTEM PROVIDER 2010-11

BIG TUJUNGA DAM

(USA)

SHIMMICK CONSTRUCTION CO/OBAYASHI CORPORATION JV, SYSTEM PROVIDER 2007-08

CHICKAMAUGA LOCK COFFERDAM

(USA)

C.J. MAHAN CONSTRUCTION CO, SYSTEM PROVIDER 2006-08

CHARLEROI LOCKS/DAM

(USA)

TRUMBULL/BRAYMAN JV, SYSTEM PROVIDER 2005-06

LA UNION PORT DEVELOPMENT PROJECT

(EL SALVADOR)

CPK CONSULTORES, SYSTEM PROVIDER 2005

SALUDA DAM REMEDIATION

(USA)

BARNARD CONSTRUCTION, SYSTEM PROVIDER 2002-04

GHAZI BAROTHA

(PAKISTAN)

PLANTERS & CO., SYSTEM PROVIDER 1997-99

KALI GANDAKI HYDROELECTRIC PROJECT

(NEPAL)

IMPREGILO, SYSTEM PROVIDER 1997-99

DAULE-PERIPA DAM

(ECUADOR)

IMPREGILO, SYSTEM PROVIDER 1997-99

Bluestone Dam, Phase 5

(USA)

Brayman Construction Corp, System Provider 2020

Soo Locks, Phase 3

(USA)

Kokosing Alberici Traylor LLC, System Provider 2022-23